28th Street/Little Portugal station

28th Street/Little Portugal station[1] is a proposed underground Bay Area Rapid Transit station in the Little Portugal neighborhood of San Jose, California. It would be located north of East Santa Clara Street between North 28th Street and U.S. Route 101, behind Five Wounds Portuguese National Church.[2] Preceded by Berryessa/North San José station, it would be the first station of the Phase II portion of the Silicon Valley BART extension. The station would have direct service to Santa Clara, Richmond, and San Francisco/Daly City.

28th St/Little Portugal
Bay Area Rapid Transit
General information
Location28th Street
San Jose, CA
Coordinates37°21′05″N 121°51′54″W / 37.3513°N 121.86509°W / 37.3513; -121.86509
Owned byBay Area Rapid Transit
Platforms2 side platforms
Tracks2
Construction
Structure typeCut-and-cover
AccessibleYes
History
Opening2036; 12 years' time (2036) (estimated)
Services
Preceding station Bay Area Rapid Transit Following station
Future service
Berryessa/​North San José
toward Richmond
Orange Line Downtown San José
Berryessa/​North San José
toward Daly City
Green Line
Route map
Location
Map

When this station, and all the Silicon Valley Extension stations, is completed, it will be served by the Green and Orange Lines.

History

edit

A separate extension[3] was built from Fremont to Warm Springs station in the Warm Springs District (also in Fremont). This was followed by phase I of the Silicon Valley BART extension into eastern San Jose, built by VTA. The entire San Jose/Santa Clara extension, including Alum Rock station (as it was referred to at the time), was originally intended to be built in a single project, but funding could not be secured; therefore, the San Jose extension was split into two phases, and Alum Rock was placed in the second phase.

In planning, the station was referred to as Alum Rock/28th Street, after the Alum Rock neighborhood to the northeast.[2][4] On November 7, 2019, VTA renamed the station to 28th Street/Little Portugal in response to community feedback.[4][5] If funding is secured, construction is slated to begin in 2024, and open to passenger service in 2036.[6] This station will be located between the Berryessa/North San José and Downtown San Jose Stations and will be served by VTA buses.

References

edit
  1. ^ "FACT SHEET VTA's BART Silicon Valley Phase II Project: 28th Street/Little Portugal Station" (PDF). VTA. Retrieved 25 April 2020.
  2. ^ a b "Fact Sheet: Alum Rock/28th Street Station" (PDF). BART Silicon Valley Phase II Extension Project. Santa Clara Valley Transportation Authority. November 8, 2018. Retrieved March 6, 2019.
  3. ^ "Warm Springs Extension Project Overview | bart.gov". www.bart.gov. Archived from the original on 2016-12-08. Retrieved 2018-04-13.
  4. ^ a b "Station Name". Santa Clara Valley Transportation Authority. November 7, 2019. Retrieved May 15, 2020.
  5. ^ "BART & VTA Partnership Special Committee Meeting" (PDF). San Francisco Bay Area Rapid Transit District. March 21, 2019. p. 8. Retrieved May 15, 2020.
  6. ^ "BART delays loom for downtown San Jose: BART timetable for downtown San Jose service now seen as 2030". San Jose Mercury News. September 24, 2019. Retrieved October 10, 2019. At one point, political and business leaders had anticipated BART service beginning in 2026 in downtown San Jose, but the new estimates from VTA point to a service launch more in the 2029 or 2030 time frame…
edit