501 Queen (301 Queen during overnight periods) is an east–west Toronto streetcar route in Ontario, Canada, operated by the Toronto Transit Commission (TTC). It stretches from Neville Park Loop (just west of Victoria Park Avenue) in the east, running along Queen Street and in a reserved right-of-way within the median of the Queensway to Humber Loop in the west. In the late evenings, the 501 Queen route is extended west from Humber Loop, running on Lake Shore Boulevard to Long Branch Loop (just west of Browns Line, adjacent to Long Branch GO Station), replacing route 507 Long Branch. This route operates as part of the TTC's Blue Night Network service, operating in the early morning hours as the 301 Queen.[4]

501 Queen
Westbound 501 Queen streetcar at Queen and University
Overview
LocaleToronto, Ontario
Termini
Stations
WebsiteOfficial route page
Service
SystemToronto streetcar system
Route number501 (301 overnight)
Operator(s)Toronto Transit Commission
Depot(s)Russell Carhouse[1]
Rolling stockFlexity Outlook
Daily ridership46,116 (2022, weekdays)[2]
History
Opened1875; 149 years ago (1875)
Technical
Line length
Track gauge4 ft 10+78 in (1,495 mm)
Electrification600 V DC overhead
Route map

Transfer stop
Intermediate stop
Carhouse
Route:
Connection  00  Terminus  00 

Long Branch GO Station
Long Branch Loop
 110A/110B 
MiWay: MiWay  5/5B   23 
Browns Line/39th Street ↑
 110A   123 
37th Street
Long Branch Avenue
↓ 31st Street/30th Street ↑
↓ 28th Street/29th Street ↑
↓ 27th Street/26th Street ↑
22nd Street
Kipling Avenue
 44 
15th Street
13th Street
10th Street
Islington Avenue (7th Street)
 110 
5th Street
3rd Street
1st Street
Royal York Road
 76 
↓ Miles Road/Symons Street ↑
Douglas Boulevard
↓ Norris Crescent/Hillside Avenue ↑
Mimico Avenue
 76 
Superior Avenue
Burlington Street
Louisa Street
Legion Road
↓ Marine Parade Drive/Park Lawn Road ↑
 66B   145 
2155 Lake Shore Boulevard West
2111 Lake Shore Boulevard West
Metrolinx Oakville Subdivision
Humber Loop
 66A 
South Kingsway
Windermere Avenue
 77 
Ellis Avenue
Colborne Lodge Drive
Parkside Drive
 80 
Glendale Avenue
The Queensway
Queen Street West
Roncesvalles Carhouse
Roncesvalles Avenue
 504 
King Street West
504 to downtown
Triller Avenue
↓ Beaty Avenue/Sorauren Avenue ↑
↓ Jameson Avenue/Lansdowne Avenue
 47 
↓ Dunn Avenue/O'Hara Avenue ↑
Brock Avenue
Dufferin Street
 29   929 
Metrolinx Galt Subdivision & Weston Subdivision
Gladstone Avenue
↓ Abell Street/Beaconsfield Avenue ↑
Dovercourt Road
Ossington Avenue
 63 
Shaw Street
 63 
Strachan Avenue
↓ Niagara Street/Claremont Street ↑
↓ Tecumseth Street/Palmerston Avenue ↑
Bathurst Street
 145   511 
Augusta Avenue
Spadina Avenue
 510 
↓ Peter Street/Soho Street ↑
John Street
McCaul Street
 502 
St. Patrick Street
University Avenue
 142 
York Street
Bay Street
 6   6A 
Yonge Street
 97B 
Victoria Street
Church Street
Jarvis Street
Sherbourne Street
 75 
Ontario Street
Parliament Street
 65 
Sackville Street
Sumach Street
River Street
arrow for UL King Street East
503 & 504 to downtown
Metrolinx Bala Subdivision
Carroll Street
Broadview Avenue
 504 
Boulton Avenue ↑
Metrolinx Kingston Subdivision
Empire Avenue
Logan Avenue
Carlaw Avenue
 72 
Pape Avenue
 72A 
↓ Caroline Avenue/Brooklyn Avenue ↑
Jones Avenue
 83 
Leslie Street
↓ Laing Street/Alton Avenue ↑
Greenwood Avenue
 31 
Russell Carhouse
Connaught Avenue
Woodfield Road
Coxwell Avenue
 22 
↓ Eastern Avenue/Kingston Road ↑
 22A   502   503 
Woodbine Loop
↓ Sarah Ashbridge Avenue/Lockwood Road ↑
Woodbine Avenue
 92 
↓ Kippendavie Avenue/Elmer Avenue ↑
Bellefair Ave
Wineva Avenue
 64 
Glen Manor Drive
MacLean Avenue
Spruce Hill Road
Beech Avenue
Silver Birch Avenue
Neville Park Boulevard
Neville Park Loop
 143 

In 2022, with almost 12.8 million annual boardings, 501 Queen was the second busiest streetcar line in Toronto, after 504 King. (In 2019, prior to the drop in ridership due to the COVID-19 pandemic, there were 22.0 million annual boardings.)[5]

History

edit

1875–1999

edit

In 1875, the Kingston Road Tramway operated a horsecar service along what would become today's Queen Street East. This line was abandoned in the mid 1880s, at about which time the Toronto Street Railway extended its King horsecar line onto Queen Street East to Lee Avenue in the Beaches district. In 1893, the Toronto Railway Company electrified the line. In 1921, the TTC took over streetcar service.[6]

From 1923 to 1928, the Beach streetcar line ran along Queen Street from Neville Park Boulevard to the Humber River similar to today's 501 Queen. At about this time, there was also a route named "Queen", but it ran along Kingston Road to McCaul and Queen streets much like the 502 Downtowner that ran until 2019.[6]

From 1928 to 1937, service to the eastern and western ends of Queen Street was handled by separate routes. Thus, one would need to transfer streetcars in the downtown area to travel the full length of Queen Street.[6][7]

On August 2, 1937, a new Queen route served all of Queen Street between Neville Park Loop and Parkside Loop.[6] (The Parkside Loop was located at the northeast corner of Lakeshore Boulevard and Parkside Drive, south of the rail corridor, which was crossed by a bridge.[8]) East of Roncesvalles Avenue, the Queen route resembled today's 501 Queen.[9]

On September 14, 1940, the PCC streetcar was introduced on the Queen route on Sundays, displacing Peter Witt streetcars.[10]: 42  PCCs were placed in Queen night service on October 3, 1940,[10]: 43  and in regular daily service on May 1, 1941.[10]: 44 

By 1954, when the Yonge subway (today part of Line 1 Yonge–University) opened, an underground streetcar station was partially built at Queen station to eventually allow streetcars to cross under the subway tracks. The plan was to put the Queen streetcar line in a tunnel under Queen Street between Logan Avenue and Trinity Park. However, because of changing ridership patterns, the plan was dropped in favour of east–west subway line along Bloor Street and Danforth Avenue (today's Line 2 Bloor–Danforth). Today, Lower Queen remains a ghost station.[11]

In 1957, to accommodate construction of the Gardiner Expressway, the streetcar tracks were removed from Lake Shore Boulevard between Roncesvalles Avenue and the Humber River, and the bridge crossing the rail corridor was demolished. As a replacement, a new private right-of-way was built along the Queensway from the Sunnyside Loop to the Humber Loop. At the Humber Loop, passengers could transfer to the Long Branch streetcar which shuttled between the Humber and Long Branch loops.[6][12]

Between 1967 and early 1977, two-car multiple-unit PCC trains served the Queen streetcar route.[6]

On March 26, 1995, the 507 Long Branch route was replaced by a westward extension of the 501 Queen route,[6] resulting in the Queen route attaining a length of 24.6 kilometres (15.3 mi).[3] In 2010, National Geographic described 501 Queen as one of the longest streetcar lines in North America.[13] In 2012, a National Post article made a similar claim.[14] In late 2023, a reinstated 507 route would be carved out of the 501 route, reducing the length of the latter except in late evening.[4]

2000–present

edit
 
A CLRV car at Long Branch Loop
 
An ALRV car on 501 Queen crossing the Don River in Toronto in September 2011

In 2013, the TTC considered setting up a transit mall on the downtown portion of either Queen or King Street. TTC CEO Andy Byford wanted a car-free corridor along one of the city's two busiest streetcar lines (either 501 Queen or 504 King) to prevent bunching, gaps and service delays. Byford would ban general automobile traffic along the streetcar corridor but allow cyclists, taxicabs and delivery trucks. Byford preferred King Street for the transit mall because of recent condominium development along that street. There were similar proposals for a transit mall in 2001 and 2007.[15] Ultimately, the King Street Transit Priority Corridor was established in late 2017.

On January 3, 2016, the 501 Queen route was split into two sections at Humber Loop in order to make its service more reliable. Effectively, the section west of Humber Loop became the 507 Long Branch route in all but name.[16]

In January 2017, construction began for approximately 15 months on various projects west of Roncesvalles Avenue, including rebuilding the bridge over the Humber River carrying streetcar tracks.[17] Other work included replacing track and overhead along portions of the Queensway and Lake Shore Boulevard as well as at the Humber Loop. Also at the Humber Loop, a new substation was built, platforms were made accessible to accommodate Flexity streetcars and a siding on the west-to-east loop was modified.[18][19][20] In April 2018, streetcar operations resumed between Sunnyside Loop and Humber Loop.[21][22] Streetcar service between Humber Loop and Long Branch Loop resumed in June 2018.[23]

From May to September 2017, all streetcar service along the entire 501 Queen route was replaced by buses to permit multiple construction projects along Queen Street to take place, including the replacement of an overhead pedestrian walkway at the Eaton Centre, which required overhead wires to be removed. According to a TTC spokesperson, it took 65 buses to replace the 50 streetcars then operating east of the Sunnyside Loop.[17]

Since March 31, 2021, the 501 Queen route has been partially closed due to construction activity, including track replacement and the extension of the exclusive streetcar right-of-way on the Queensway west of Roncesvalles Avenue. Also, the TTC was upgrading the streetcar overhead for pantographs.[24] The result was that streetcar service was temporarily replaced by buses from Parliament Street to Long Branch Loop, with a diversion along King and Bathurst Streets to Wolseley Loop.[25] Streetcar service was restored along Queen Street between Parliament and Bathurst Streets on February 13, 2022,[26] to Dufferin Street on September 4, 2022,[27] to Roncesvalles Avenue (Sunnyside Loop) on January 25, 2023[28] and to Humber Loop on October 29, 2023. Route 501 service to Long Branch Loop was scheduled to resume on November 19, 2023.[29]

 
501 Queen on a long-term diversion eastbound at York & Adelaide Streets

On May 1, 2023, an estimated 4.5-year closure of Queen Street between Victoria and Bay Streets began to allow construction of the Ontario Line at Queen station. Initially, the TTC diverted 501 streetcars via McCaul Street, Dundas Street and Broadview Avenue.[30] On September 3, 2023, the TTC split Queen streetcar service into eastern and western segments; 501A streetcars would run between Sunnyside Loop and McCaul Loop, and the diverted 505 Dundas streetcar route would be extended from Broadview Avenue to Neville Park Loop.[31] On October 8, 2023, the TTC replaced the eastern segment of the split route with the 501D streetcar which would run east on Queen Street from Neville Park Loop, south on Church Street looping via Church, Wellington and York Streets, returning via King Street to Church Street.[32] The TTC was planning to rejoin the two segments of the line by a new diversion between Church and York Streets, via Richmond Street westbound and Adelaide Street eastbound.[30] By October 6, 2024, the TTC had published schedules for such a diversion.[33] However, on that date, the TTC decided to provide a temporary diversion in both directions via Spadina Avenue, King Street and Church Street.[34] On November 10, 2024, the TTC started operating the planned diversion route via Richmond and Adelaide Streets, with eastbound streetcars using new track on York and Adelaide Streets.[35]

Effective November 19, 2023, the TTC reinstated route 507 Long Branch to run between Humber and Long Branch Loops, replacing the 501 Queen along Lake Shore Boulevard but only until late evening.[4]

On March 31, 2024, 301 Queen night streetcar service resumed, ending replacement bus service between Long Branch and Neville Park Loops. However, due to Ontario Line construction, 301 streetcars had to divert via Spadina Avenue, King Street and Church Street.[36]

Rolling stock

edit
 
ALRVs once provided base service on 501 Queen (photo at Maclean Ave)

Route 501 Queen was once served mainly by Articulated Light Rail Vehicles (ALRVs) and occasionally supplemented with some of the shorter Canadian Light Rail Vehicles (CLRVs).[37] However, by 2018, the route was mainly served by CLRVs.[38] This was due to the declining reliability and accelerated retirement of the ALRV fleet.[39]

Flexity Outlook streetcars were introduced on the 501 Queen route in phases; weekend service using the Flexity vehicles along the route began in September 2018[40] and moved to full-time on January 6, 2019. The TTC had to address rush-hour crowding due to the accelerated retirement of the ALRV fleet, the last of which made their final voyages on September 2, 2019.[41][42]

By June 23, 2019, the main portion of the route (along Queen Street and the Queensway between Humber Loop and Neville Park Loop) was the first to be fully served by Flexity Outlook streetcars; the southwest portion of the route (along Lake Shore Boulevard between Humber and Long Branch Loop) followed suit on September 1, 2019.[43][44]

Route splitting

edit

2009 split

edit

By 2007, critics of the TTC's management of this line argue that small delays at one end ripple into 30-40 minute waits at the other. Like route 504, there is much demand at either end of the route, and along the downtown middle stretch. Transit proponents such as Steve Munro have long claimed that Route 501 would be better off if it were split into two or three overlapping segments.[45]

In late 2009, the TTC conducted an experiment of splitting the 501 streetcar route into two overlapping segments, as recommended by critics to alleviate bunching, gaps and short turns when delays occurred.[46][47] During the experiment streetcars from the Neville Park Loop ran west on Queen Street as far as Shaw Street, and from Long Branch Loop or Humber Loop east as far as Parliament Street.[48][49]

In January 2010, the commission received a report analyzing several of the experiments done in 2009 to increase service reliability. It was determined that splitting the route increased short turns by 90%, required more streetcars and resulted in poorer service. The TTC decided to use a route-management system called Step Forward, whereby when an operator goes off duty (break or end of shift), another operator takes over the streetcar instead of the streetcar going out of service along with off-duty operator. According to the TTC, Step Forward reduced short turns in late 2007, from 32.5% to 9.7% in the PM rush hours, and from 13.9% to 4.1% in the AM rush. It also was successful in reducing service gaps according to the TTC. Implementing Step Forward required eight extra operators and two extra supervisors.[50][51]

2016 split

edit

By 2015, passengers were complaining about service on the 501 streetcar. Streetcars would often arrive at irregular intervals, causing unscheduled waits of 20–30 minutes. Streetcars would also do unscheduled short turns at Kingston Road or Roncesvalles Avenue, forcing passengers to exit and wait for the next streetcar. To address these problems and make service more predictable for riders, the TTC again split the 501 Queen route.[16]

On January 3, 2016, the route was split into two sections at Humber Loop. The split was in effect only from 5 am to 10 pm. During the split, service over the entire route operated at intervals of ten minutes or better. The change was also made to provide more frequent service on each segment and to eliminate all but emergency short turns (such as for an accident) on the segment east of Humber Loop. Transfer-free service through Humber Loop was still provided by 3 runs in the morning, in the late evening and overnight. Some riders reported shorter streetcar wait times after the split.[16][52][53]

The split was suspended starting from January 8, 2017,[17] due to construction projects affecting Humber Loop. When streetcar service west of Humber Loop resumed on June 24, 2018, the split was reinstated.[22] Initially, the TTC provided five transfer-free trips during the morning peak period; however, effective September 2, 2018, the TTC temporarily suspended these five runs due to a shortage of streetcars.[54]

From June 21, 2020, most 501 Queen streetcars operated the full route between Neville Park and Long Branch loops. This ended the split in 501 Queen service at Humber Loop where passengers from Long Branch had to change streetcars to continue downtown.[55]

Route

edit

From Neville Park Loop, the route proceeds westward in mixed traffic on Queen Street East. At Kingston Road, passengers can transfer to the 503 Kingston Rd streetcars. Further west, Broadview Avenue provides a transfer point to the 504 King streetcars to go along King Street.[56]

Normally, the route continues west from Broadview Avenue along Queen Street, passing Queen station at Yonge Street and Osgoode station at University Avenue, where both stations serve subway Line 1 Yonge–University. However, construction of the Ontario Line necessitated the closure of Queen Street to all traffic between Church and Bay Streets from May 2023 until late 2027. Since May 2023, the TTC has used various diversions for 501 streetcars. On November 10, 2024, the 501 Queen started diverting around the construction site westbound via Richmond Street and eastbound via Adelaide Street, between York and Church Streets.[35]

Further west at Spadina Avenue, riders can transfer to 510 Spadina streetcars, and at Bathurst Street, to 511 Bathurst streetcars. The route continues to the western end of Queen Street West at the intersection of King Street West and Roncesvalles Avenue where riders can again transfer to 504 King streetcars.[56]

West of Roncesvalles Avenue, Queen Street West flows onto the Queensway, where 501 Queen streetcars run in their own right-of-way until reaching the off-street Humber Loop. During the day and early evening, riders continuing to Long Branch must transfer to the 507 Long Branch streetcar. During late evening, 501 Queen streetcars continue westbound to Long Branch Loop, replacing the 507 streetcars. West of Humber Loop, the line passes through a short streetcar tunnel under a railway corridor and the Gardiner Expressway. The line emerges from the tunnel onto Lake Shore Boulevard West and proceeds westward in mixed traffic to Long Branch Loop, where both the 507 and late evening 501 streetcars terminate.[56]

507 Long Branch

edit

Route 507 Long Branch is a streetcar route running along Lake Shore Boulevard West between Humber Loop and Long Branch Loop. It was created on October 28, 1935, merged into an extended 501 Queen on March 26, 1995[57] and reinstated as a separate route on November 19, 2023.[4]

Route 507 Long Branch operates daily until late evening, when 501 Queen service is extended west from Humber Loop to Long Branch Loop, replacing 507 service. Overnight, night route 301 Queen replaces both 507 Long Branch and 501 Queen.[4][36]

Sites along the line

edit

From east to west:

edit

Toronto's Brickworks Ciderhouse produces a semi-sweet cider called the "Queen Street 501" which is an homage to the streetcar route, as well as Queen Street in general.[58]

See also

edit

References

edit
  1. ^ "TTC Service Summary March 29, 2020 to May 9, 2020" (PDF). Toronto Transit Commission. March 29, 2020. Archived from the original (PDF) on September 21, 2020. Retrieved May 1, 2020.
  2. ^ "Weekday boardings and service information for surface routes (bus and streetcar), 2022" (PDF). Toronto Transit Commission. 2022. Archived (PDF) from the original on January 11, 2024.
  3. ^ a b "Service Summary - March 29, 2020 to May 9, 2020" (PDF). Toronto Transit Commission. Archived from the original (PDF) on September 21, 2020. 2020 summary shows streetcar route lengths prior to the diversions of 2021–2023.
  4. ^ a b c d e "Streetcar service returns on Lake Shore Boulevard West". Toronto Transit Commission. November 19, 2023. Archived from the original on November 14, 2023.
  5. ^ "Transit Planning – Annual streetcar boardings by route". Toronto Transit Commission. 2022. Archived from the original on September 22, 2023. Retrieved January 10, 2024.
  6. ^ a b c d e f g Bow, James (September 6, 2017). "Route 501 - The Queen Streetcar". Transit Toronto. Retrieved January 30, 2018.
  7. ^ "System Map - 1930". Toronto Transportation Commission. 1930. Retrieved January 30, 2018.
  8. ^ Forman, Roman (1945). "Streetcar System Map 1945" (PDF). Transit Toronto. Retrieved January 30, 2018.
  9. ^ "System Map - September 1, 1938". Toronto Transportation Commission. September 1, 1938. Retrieved January 30, 2018.
  10. ^ a b c Louis H. Pursley (1961). The Toronto Trolley Car Story 1921–1961. Interurbans: electric railway publications.
  11. ^ Bow, James (February 19, 2017). "Toronto's Lost Subway Stations". Transit Toronto. Retrieved January 30, 2018.
  12. ^ "System Map - October 1958". Toronto Transit Commission. October 1958. Retrieved January 30, 2018.
  13. ^ "Top 10 Trolley Rides". National Geographic. January 21, 2010. Archived from the original on April 23, 2023.
  14. ^ "Riding the 501: The longest streetcar route in North America". National Post. March 24, 2012. With nearly 25 kilometres of track, the 501 Queen is the longest streetcar route operating in North America.
  15. ^ Kitching, Chris (June 20, 2013). "TTC head floats streetcar corridor on King or Queen". CablePulse 24. Retrieved January 31, 2018.
  16. ^ a b c Stevenson, Verity (January 3, 2016). "Queen streetcar riders get what they've waited for: more service". Toronto Star. Retrieved January 3, 2016.
  17. ^ a b c Wilson, Codi (March 1, 2017). "Buses to replace streetcars on Queen Street this summer". CablePulse 24. Retrieved January 30, 2018.
  18. ^ "TTC Service Changes Effective Sunday, January 8, 2017 (Updated)". Steve Munro: Transit & Politics. December 11, 2016.
  19. ^ Munro, Steve (January 28, 2018). "Reconstruction of The Queensway and Humber Loop". Steve Munro. Retrieved January 30, 2018.
  20. ^ "TTC 501 Queen route converts to buses west of Roncesvalles for 2017". Toronto Transit Commission. December 16, 2016. Retrieved February 1, 2018.
  21. ^ "501 Queen - Streetcar restrictions during several construction projects - February 18 update". Toronto Transit Commission. February 18, 2018. Archived from the original on February 2, 2018. Retrieved February 1, 2018.
  22. ^ a b "TTC service improvements and changes". Toronto Transit Commission. Archived from the original on April 11, 2018. Retrieved April 1, 2018.
  23. ^ "TTC service improvements and changes". Toronto Transit Commission. June 24, 2018. Archived from the original on June 25, 2018. Retrieved June 24, 2018.
  24. ^ "Construction Update #2 (KQQR)" (PDF). City of Toronto. March 12, 2021. Archived from the original (PDF) on March 16, 2021. Retrieved June 16, 2021.
  25. ^ "TTC 501 Queen – Temporary route change – City/TTC Construction". ttc.ca. TTC. Archived from the original on May 11, 2021. Retrieved May 10, 2021.
  26. ^ "TTC service changes". Toronto Transit Commission. February 13, 2022. Archived from the original on February 10, 2022.
  27. ^ "TTC service adjustments". Toronto Transit Commission. Archived from the original on September 4, 2022. Retrieved September 4, 2022.
  28. ^ "TTC service adjustments". Toronto Transit Commission. February 12, 2023. Archived from the original on February 11, 2023.
  29. ^ "TTC restoring streetcar service to Humber Loop, improving west-end service from Sunday". Toronto Transit Commission. October 27, 2023. Archived from the original on October 28, 2023.
  30. ^ a b Harvey, Lex (April 29, 2023). "'All hands on deck': Toronto braces for a decade of traffic turmoil as Ontario Line work shuts city streets". Toronto Star. Retrieved April 30, 2023.
  31. ^ "501-301 Routing change". Toronto Transit Commission. September 3, 2023. Archived from the original on October 5, 2023. Retrieved October 5, 2023.
  32. ^ "October (2023) service adjustments". Toronto Transit Commission. October 8, 2023. Archived from the original on October 3, 2023. Retrieved October 3, 2023.
  33. ^ "501 Queen". Toronto Transit Commission. Retrieved October 6, 2024.
  34. ^ "Streetcar Service Changes". Toronto Transit Commission. Retrieved October 6, 2024.
  35. ^ a b "Improvements coming to TTC's 501 Queen streetcar service this weekend". Toronto Transit Commission. November 6, 2024. Archived from the original on November 9, 2024.
  36. ^ a b "Streetcar Service Changes". Toronto Transit Commission. March 31, 2024. Archived from the original on March 29, 2024.
  37. ^ "Service Summary - March 26, 2017 to May 6, 2017" (PDF). Toronto Transit Commission. March 26, 2017. Archived from the original (PDF) on July 25, 2021. Retrieved April 26, 2018.
  38. ^ "TTC Service Summary" (PDF). Toronto Transit Commission. February 18, 2018. Archived from the original (PDF) on November 28, 2018. Retrieved February 2, 2018.
  39. ^ Munro, Steve (April 17, 2018). "Service Capacity on 501 Queen". Steve Munro. Retrieved April 26, 2018. For many years, the capacity alleged was based on the longer ALRV (articulated) streetcars, but the service was actually operated by a mix of the shorter CLRVs and ALRVs. This was due to two factors: the declining reliability of the ALRV fleet, and the desire to increase capacity on 504 King.
  40. ^ Bow, James [@TransitToronto] (September 20, 2018). "Sunday, September 2, 2018, was the first day for regularly scheduled #TTC #Bombardier #Flexity service on 501 QUEEN, albeit just on weekends only. Here we see Flexity LRV 4455 heading westbound on Queen approaching Church Street. Photo by @jamesbow. http://bit.ly/2pk9GbJ" (Tweet) – via Twitter.
  41. ^ "TTC's 'bendy streetcars' reach the end of the line". TTC. August 29, 2019.
  42. ^ "TTC service improvements and changes". Toronto Transit Commission. January 6, 2018. Archived from the original on December 31, 2018. Retrieved December 31, 2018.
  43. ^ "Accessible streetcar service updates". TTC. July 2, 2019. Archived from the original on July 2, 2019.
  44. ^ "Service Summary - September 1, 2019 to October 12, 2019" (PDF). Toronto Transit Commission. Archived from the original (PDF) on November 27, 2019.
  45. ^ Kuitenbrouwer, Peter (November 24, 2007). "Crown jewel badly tarnished". National Post. Toronto. Retrieved January 21, 2008.[dead link]
  46. ^ "TTC temporarily splits 501 streetcar route". CBC News. October 19, 2009. Archived from the original on February 13, 2016. Toronto transit advocate Steve Munro said that people who are travelling downtown from the outer ends of the city will still be able to make the trip in one ride.
  47. ^ Vela, Thandiwe (October 15, 2009). "TTC to split Queen streetcar route". Toronto Star. Archived from the original on February 13, 2016. On weekdays between Oct. 19 and Nov. 20, the west portion of the route will run from Long Branch to Parliament St. while the east portion will run from Neville Park to Shaw St., the TTC announced in a statement. Saturday, Sunday and holiday service will not be changed.
  48. ^ "October 2009 - Service changes effective October 18, 2009". TTC. October 2009. Archived from the original on October 19, 2009. Retrieved September 22, 2009.
  49. ^ "TTC Service Summary" (PDF). Toronto Transit Commission. September 18, 2009. Archived from the original (PDF) on June 29, 2021. Retrieved October 24, 2009.
  50. ^ "501 Queen Streetcar Route: Final Recommendations" (PDF). TTC. January 20, 2010. Archived from the original (PDF) on February 26, 2021. Retrieved July 29, 2012.
  51. ^ Kalinowski, Tess (January 19, 2010). "TTC gives up attempt to divide Queen route". Toronto Star. Archived from the original on February 13, 2016. A report before the city councillors on the Toronto Transit Commission on Wednesday shows that splitting the route in half actually increased the number of short turns by 90 per cent overall during a five-week experiment last October and November.
  52. ^ Munro, Steve (January 3, 2016). "501 Queen Service Design Effective January 3, 2016". Retrieved January 3, 2016.
  53. ^ "501 Queen - Service increase". Toronto Transit Commission. January 3, 2016. Archived from the original on January 10, 2016. Retrieved January 19, 2016. The route will be temporarily split into two separate sections, operating between Long Branch Loop and Humber Loop, and between Neville Park Loop and Humber Loop.
  54. ^ "TTC service improvements and changes". Toronto Transit Commission. September 2, 2018. Archived from the original on August 30, 2018. Retrieved September 2, 2018.
  55. ^ Munro, Steve (June 8, 2020). "TTC Service Changes Effective Sunday, June 21, 2020". Steve Munro. Retrieved July 1, 2020.
  56. ^ a b c "501 Queen". Toronto Transit Commission. Retrieved July 23, 2023.
  57. ^ Bow, James (September 6, 2017). "Route 507 - The Long Branch Streetcar (Deceased)". Transit Toronto. Retrieved March 1, 2018.
  58. ^ "Queen Street 501". TheCiderHouse.ca. Retrieved September 21, 2019.
edit
KML is not from Wikidata