Gucun Park (simplified Chinese: 顾村公园; traditional Chinese: 顧村公園), formerly Gucun, is an interchange station between Line 7 and Line 15 on Shanghai Metro. It began operation on 28 December 2010. It became an interchange station with Line 15 when it opened on 23 January 2021, and serves as the northern terminus of Line 15. [1]
General information | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Jingpohu Road near Qilianshan Road Baoshan District, Shanghai China | |||||||||||||||
Coordinates | 31°20′47″N 121°22′05″E / 31.346389°N 121.368056°E | |||||||||||||||
Operated by | Shanghai No. 3 Metro Operation Co. Ltd. | |||||||||||||||
Line(s) | Line 7 Line 15 | |||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened |
| |||||||||||||||
Previous names | Gucun | |||||||||||||||
Services | ||||||||||||||||
|
The station is located in Gucun town, in Shanghai's Baoshan District.
Station layout
editG | Entrances and exits | Exits 1-6 |
B1 | Concourse | Fare gates, station agent |
B2 | Northbound | ← Line 7 towards Meilan Lake (Liuhang) |
Island platform, doors open on the left | ||
Southbound | Line 7 towards Huamu Road (Qihua Road) → | |
Northbound | ← Line 15 termination track | |
Island platform, doors open on the left | ||
Southbound | Line 15 towards Zizhu Hi-tech Park (Jinqiu Road) → |
Gallery
edit-
Line 15 Concourse
-
Line 15 Platform Sign
-
Exit 3
References
edit- ^ Huizhi, Chen (24 December 2020). "World's largest subway system set to expand". Shine. Shanghai Daily. Retrieved 24 December 2020.