Talk:Fall Line Freeway

Latest comment: 2 years ago by Styyx in topic Requested move 26 June 2022

Washington County

edit

Why is there a small length in Washington County between Sandersville and Milledgeville that is still two-laned? I saw no discussion of this in the article. — Preceding unsigned comment added by 168.16.215.22 (talk) 17:06, 27 July 2020 (UTC)Reply

I looked on Google Maps and added the two-lane segments to the lead. Thank you for bringing this to my attention. Morriswa (Charlotte Allison) (talk) 07:26, 28 July 2020 (UTC)Reply
There was a landslip during construction of that segment; GDOT is planning to let a project to repair the landslip and finish the four-lane section in 2022. lordsutch (talk) 02:58, 31 December 2021 (UTC)Reply

Requested move 26 June 2022

edit
The following is a closed discussion of a requested move. Please do not modify it. Subsequent comments should be made in a new section on the talk page. Editors desiring to contest the closing decision should consider a move review after discussing it on the closer's talk page. No further edits should be made to this discussion.

The result of the move request was: not moved. (closed by non-admin page mover) ~StyyxTalk? 18:45, 3 July 2022 (UTC)Reply


Fall Line FreewayGeorgia State Route 540 – The page itself should be called Georgia State Route 540 as it is designated as SR 540 as it is called a freeway, though it is composed of both limited-access and high-speed divided highway portions.--2600:1700:6180:6290:7184:C438:8808:19FE (talk) 17:44, 26 June 2022 (UTC)Reply

The discussion above is closed. Please do not modify it. Subsequent comments should be made on the appropriate discussion page. No further edits should be made to this discussion.